Manchester United – Quadrants
Achieving a design with complicated interfaces, within a tight financial framework, is a challenge we thrive on at FK. We also had to take into consideration limited site access, which resulted in the daily co-ordination of just-in-time deliveries, to make sure the stadium was unaffected. We worked closely with our design team throughout the project, to achieve the complicated abutments to existing stands. Finishing on time was absolutely crucial to the club, so we devised a ‘fast-track’ construction process pitch side, to ensure the seating area release dates were met.
Specifications
Developer
Manchester United Plc
Location
Old Trafford, Manchester
Main contractor
Laing O`Rourke