FK have been working with Astra Zeneca since 1996. In 2001, we became involved in the design, build-ability and overall project budget of this development and were responsible for liaising with numerous other contractors and specialist suppliers to ensure the project’s success within the programme dates.
On this project, the co-ordination of just-in-time material deliverers was particularly complicated, especially the long curved roof sheet, as the site has a tight footprint and is surrounded by a working manufacturing plant.
In this instance, we agreed an open book project reconciliation with the client, through monthly cost and progress reports throughout the project.
Developer
Astra Zeneca
Location
Macclesfield
Main contractor
Astra Zeneca Engineering
Specification
5,500m2 of Kalzip standing seam roofing, including walkways, roof lights and ansafe systems.
1,000m2 of single ply membrane, including, walkways and PVC paving pads.
Sustainability initiatives
Sustainable products selected to achieve a design compliant with Part L2.