The scope and organisational approach of FK enabled us to co-ordinate two waste project sites for W2R, which were constructed in tandem. As well as playing an instrumental role in the initial design stages for each site, we managed and delivered these large schemes on time and to budget, rising to the challenges faced in procurement and project management, with ease. We also ensured the finish met all requirements for waste treatment operations, such as internal ambient requirements for penetrations within an aggressive environment.

Specifications

Developer
W2R

Location
Leyland and Thornton

Main contractor
Bovis Lend Lease

Specification
Over 100,000sqm of roof and wall cladding materials.
Syphonic drainage work installation.
Glazing installation.
Fall Restraint System installation to all roof areas and penetrations.