T: (0)161 224 7227
F: (0)161 224 9284
info@fkgroup.co.uk

Download Brochure

ASDA Didcot

FK’s Strategic Partnering approach adopted during construction, taking overall responsibility for the co-ordination of all supply chain partners on site, was intrinsic to the successful and seamless delivery of this project. As the Single Point of Contact for the Client in relation to the Total Envelope installation, FK`s expertise in delivery reduced complication and rationalised processes where possible. Such delivery was made easier following an Early Design input from FK, allowing efficiencies to be identified and realised, with the most suitable and environmentally friendly products specified to meet the Clients eco requirements.

Specifications

Developer
ASDA

Location
Didcot, Oxfordshire

Main Contractor
McLaren Construction Ltd

Specification
35,700sqm KS1000RW Roof Panel.
5,100sqm EnergySaver 30 Triple Skin Rooflight.
11,000sqm KS1000RW Wall Panel.
2,300sqm KS1000EP Energipanel.
3,200sqm KS Single Skin Sheets.
200sqm KS1000MR Architectural Wall Panel.

Sustainability initiatives
Pre Raked Cutting off site of all wall panels, reducing waste generated during on site construction.
100% of wooden pallets returned for reuse or recycled.
100% of polythene recycled.
Deliveries optimised.
Parts supplied in recycled, reusable plastic containers.
100% of FK skips managed.
All site-specific Co2e info recorded to calculate carbon footprint.